Dummy activity A. is artificially introduced B. is represented by a dotted line C. does not consume time D. all the above
The Time and progress chart of a construction, is also known as A. Bar chart B. Gantt chart C. Modified Mile stone chart D. Critical path method chart E. All the above
Pick up correct statement from the following A. The float may be positive, zero or negative B. If the float is positive and the activity is delayed by a period equal to its total float, the completion of project is not delayed C. If the float of an activity is negative, delay in its performance is bound to delay the completion of project D. If the float of an activity is zero, the activity is critical and any delay in its performance will delay the whole project E. All the above.
Milestone chart A. shows the inter-dependencies of various jobs B. depicts the delay of jobs, if any C. points outgoing ahead of schedule of jobs, if any D. none of these.
Completion of activity on CPM network diagram, is generally known A. Event B. Node C. Connector D. All the above.
Overall in-charge of an organisation at the site responsible for the execution of the works, is A. Executive Engineer B. Engineer C. Junior Engineer D. Sub overseer E. Assistant Engineer
First method invented for planning projects, was A. Bar chart method B. Milestone chart C. Critical path method (CPM) D. Program Evaluation and Review Technique (PERT)
Works costing less than Rs. 20,000 and are treated as A. projects B. major projects C. minor projects D. all the above
Bar charts are suitables for A. minor works B. major works C. large projects D. all the Above
Estimated time required to perform an activity, is known as A. event B. dummy C. duration D. float